What Can We Do For You?
305.325.1930
or contact us by email

facebook-30px.png  Linkedin-30px.png  Youtube-30px.png  IN color.png   emcor_nation_30px.png

  • Home
  • About P&K
    • Awards
    • Meet the Team
    • Testimonials
    • Safety Audits and Training
    • Sustainability
  • Services
    • Construction Management
    • Design–Build
    • Water / Wastewater Construction
    • Reverse Osmosis / Nanofiltration
    • Filtration
    • Pump Stations
    • HVAC / Plumbing
    • Chiller Plants / District Cooling
    • Aviation Fueling
    • Building Information Modeling (BIM)
    • In-House Fabrication
  • Project Profiles
    • Public/Government Water Treatment Plants
    • Public/Government Wastewater Treatment Plants
    • Public/Government Municipal - Other
    • Biotech/Healthcare
    • Education
  • Contact
  • Small Business Opportunities
  • Careers

Miami-Dade County South District Wastewater Treatment Plant
HLD Upgrade Septage Receiving & Solids Process Building, MIAMI, FL

septage_miami_pk062012.jpg

VALUE DELIVERED

P&K scheduled, coordinated, procured, and executed all aspects of construction of the facilities and process equipment. Completion of the project required extremely close coordination and cooperation with Owner, Engineer and additional contractors. P&K completed the project within the original Contract Time and saved Miami-Dade Water and Sewer Department over $600,000.

CLIENT OBJECTIVES

Miami-Dade Water and Sewer Department entered into a Consent Decree with the U.S. Environmental Protection Agency (EPA) to upgrade the County’s South District Wastewater Treatment Plant—to incorporate a 285-million-gallon-per-day (mgd) capacity reclaimed water filtrations system. Additionally, the Decree mandated that the facility meet Florida Department of Environmental Protection (FDEP) High Level Disinfection (HLD) reclaimed water standards.

SCOPE OF SERVICES

Of five separate contracts for the largest construction components of this HLD treatment program awarded to P&K—a new 285-mgd filtration system, a 123-mgd capacity effluent pump station, a septage receiving and solids process building, a new oxygenation train (no. 7), and chlorine contact tanks 5 through 9—the septage receiving and solids building is discussed herein.

SOLUTIONS

In February 2010, Poole & Kent Company of Florida (P&K) was awarded the contract for construction of the Septage Receiving and Solids Process Building. Improvements included under the project include the following components:

  • A 60,000 square foot multi-level concrete block building to house the septage receiving and biosolids processing equipment. The building is equipped with an HVAC system, office space, toilets, overhead roll-up doors with air curtains for vehicle access, electrical switchgear room, and electrical power and lighting.
  • Process equipment housed within the building includes two coarse raw water influent bar screens, four fine bar screens, two spiral screw conveyors, two grit classifiers, and a two-ton traveling bridge crane.
  • Cast-in-place concrete receiving channel trough structures for the septage/liquid waste receiving area, including seven stop/slide gates, two 30 horsepower overflow pumps, two grit pumps, and two sludge pumps.
  • Two 50,000 gallon reinforced concrete fats, oil, and grease floating tanks equipped with two 72” x 36” weir gates and three 18” x 12” sluice gates.
  • An odor-control system consisting of three 60-horsepower blowers for collection of gases, three off-gas scrubbers, and caustic soda (NaOCl) chemical storage and feed systems for the scrubbers.
  • Two truck scales with truck wash down
  • Approximately 4,000 linear feet of 8-inch, 6-inch, and 4-inch ductile iron pipe (DIP) and CPVC pipe and other extensive yard piping improvements, including one 8-inch hot-tap connection to an existing 54-inch PCCP main.
  • Demolition of existing structures and site work associated with the new facility.
  • All associated instrumentation and controls.
  • Extensive yard electrical demolition and new construction.

BACKGROUND

In 2004, (MDWASD), in connection with the U.S. EPA, agreed to upgrade the County’s South District Wastewater Treatment Plant to incorporate a 285-million-gallon-per-day capacity reclaimed water filtration system. This facility will be the largest in Florida to treat wastewater to these stringent standards, and the treated wastewater will be reclaimed for use as electrical cogeneration cooling water and for irrigation of green space at Zoo Miami.

PUBLIC/GOVERNMENT
UTILITIES


OPERATING COMPANY:
Poole & Kent Company of Florida

CLIENT:
Miami-Dade Water & Sewer Department

MECHANICAL ENGINEER:
Miami-Dade Water & Sewer Department

GENERAL CONTRACTOR: 
Poole & Kent Company of Florida

SCHEDULE:
February 2010 to October 2011

COST:
Bid Price: $11,364,490
Final Price: $10,745,609

 

Poole & Kent Company of Florida - Technical Solutions, Relationships, Quality Service, Value Engineering, Experience, Project Schedule & Coordination, Expertise

 

septage_miami_A_pk062012.jpg

 

septage_miami_B_pk062012.jpg

 

septage_miami_C_pk062012.jpg

 

 

case_box.gif Design/Build
case_box_check.gif Bid BUild
case_box_check.gif New Construction
case_box.gif Retrofit/Renovation
case_box_check.gif Electrical Construction
case_box_check.gif Mechanical Construction

Project Profiles

  • Public/Government Water Treatment Plants
    • South County Regional WTP RO Expansion
    • Jupiter Nanofiltration Plant
    • City of Clearwater Water Treatment Plant #2
    • Tampa Bay Surface WTP
    • North Cape RO WTP
    • Peele Dixie Water Treatment Plant
    • Lake Region WTP
    • On-Site Sodium Hypochlorite Generation System
    • Membrane Softening Process Addition
    • SMHWTP Reservoir & Pump Station
    • Glades Road Water Disinfection
  • Public/Government Wastewater Treatment Plants
    • Septage Receiving & Solids Process Buildings
    • Chlorine Contact Tanks 5-9
    • SRWWTP Oxygen System Upgrade
    • SDWWTP Filter System
    • Effluent Pump Station No. 2
    • HLD Upgrade, Oxygenation Train #7
    • Existing Cogeneration Facility SDWWTP
    • Southwest Water Reclamation Facility Expansion
  • Public/Government Municipal - Other
    • RICE NESHAP Compliance, Phase I and II
  • Biotech/Healthcare
    • Bethesda Heart Institute
  • Education
    • Florida International University Chiller Plant
 

Poole & Kent Company of Florida

  • About Us
  • Services
  • Contact

EMCOR Group, Inc.

  • About Us
  • Locations
  • Investor Relations
  • Sustainability Efforts

NOTICE: Important Health Coverage Tax Documents.

©2025 EMCOR Group Inc.

Privacy Notice   |  CCPA Notice at Collection  |   Sitemap

NYSE: EME