What Can We Do For You?
305.325.1930
or contact us by email

facebook-30px.png  Linkedin-30px.png  Youtube-30px.png  IN color.png   emcor_nation_30px.png

  • Home
  • About P&K
    • Awards
    • Meet the Team
    • Testimonials
    • Safety Audits and Training
    • Sustainability
  • Services
    • Construction Management
    • Design–Build
    • Water / Wastewater Construction
    • Reverse Osmosis / Nanofiltration
    • Filtration
    • Pump Stations
    • HVAC / Plumbing
    • Chiller Plants / District Cooling
    • Aviation Fueling
    • Building Information Modeling (BIM)
    • In-House Fabrication
  • Project Profiles
    • Public/Government Water Treatment Plants
    • Public/Government Wastewater Treatment Plants
    • Public/Government Municipal - Other
    • Biotech/Healthcare
    • Education
  • Contact
  • Small Business Opportunities
  • Careers

Design-Build Services for
RICE NESHAP Compliance, Phase I and II, HOMESTEAD, FL

City_of_Homestead_130828.jpg

CLIENT OBJECTIVES

The City of Homestead’s objective was to update their facility in order to meet new RICE NESHAP (Reciprocal Internal Combustion Engine National Emission Standards for Hazardous Air Pollutants) requirements regulated under 40 CFR 63, subpart ZZZZ “National Emissions Standards for Hazardous Air Pollutants for Stationary Reciprocation Internal Combustion Engines.”

VALUE DELIVERED

Design and installation of new systems for retrofit power plant; compliance with RICE NESHAP requirements, minimal disruptions to facility operations; completed on schedule and within budget.

SCOPE OF SERVICES

In September 2012, Poole & Kent was awarded the contract for Phase I design, permitting, and construction for improvements to the three largest engines (one 8,800 kW unit and two 6,487 kW units) at the facility.

  • Combination silencer-catalyst units, where the oxidation catalyst equipment is located within a new silencer, to achieve a 90 percent reduction in carbon monoxide (final testing proved a 95 percent carbon monoxide reduction).
  • Monitoring equipment to record exhaust temperature and differential pressure across the catalyst
  • A filtered crankcase ventilation system meeting EPA rule compliance
  • Meeting 70 dB noise limitations at the property line
  • All required testing for Florida Department of Environmental Protection

Following the success of Phase I, in August 2013, P&K was awarded the contract for Phase II design, permitting, and construction for improvements to seven additional engines (all 2,070 kW units).

  • Combination silencer-catalyst units, where the oxidation catalyst equipment is located within a new silencer, to achieve a 70 percent reduction in carbon monoxide
  • Monitoring equipment to record exhaust temperature and differential pressure across the catalyst
  • A filtered crankcase ventilation system meeting EPA rule compliance
  • Meeting 70 dB noise limitations at the property line
  • All required testing for Florida Department of Environmental Protection

SOLUTIONS

The design-build effort was split into two phases with Phase I being the installation of the required equipment on the three largest and most highly used units, and Phase II being the installation of the required equipment on an additional seven units.

For both phases of the work, P&K was responsible for researching the available combination silencer oxidation catalysts best suited for the existing generators (based on flow rates, exhaust temperatures, piping configurations and accessibility). Additionally, P&K was responsible for reviewing available crankcase ventilation systems and researching available monitoring and data logging systems. Once the owner approved the proposed equipment, P&K was responsible for the purchase, installation, and permitting of all equipment. Comprehensive exhaust sampling tests on the catalysts were conducted in close coordination with the Florida Department of Environmental Protection (FDEP).

Work was completed with minimal disruption to daily operations of the facility. Regulations require a 70 percent reduction in carbon monoxide, but the client desired a 90 percent reduction for Phase I. Final independent testing in accordance with approved protocol of the three larger units that P&K designed and installed proved the system
achieves a 95 percent reduction in carbon monoxide. The performance exceeded the client’s expectations and far exceeded the minimum regulatory requirement.

BACKGROUND

Homestead Energy Services (HES) is responsible for the operation and maintenance of sixteen engine generator units at the G.W. Ivey Power Plant for the City of Homestead. Unit outputs range from 2,070 kW to 8,800 kW, for a total facility output of approximately 59 MW.

PUBLIC/GOVERNMENT
MUNICIPAL

 

OPERATING COMPANY:
Poole & Kent Company of Florida

CLIENT:
City of Homestead, FL

DESIGN-BUILDER/PRIME CONTRACTOR:
Poole & Kent Company of Florida

SCHEDULE:
Phase I:
September 2012 to March 2013
Phase II:
August 2013 to December 2013

COST:
Phase I: $850,000
Phase II: $910,000

 

Poole & Kent Company of Florida - Technical Solutions, Relationships, Quality Service, Value Engineering, Experience, Project Schedule & Coordination, Expertise

 

b43b9e4056eb7f2b15df05f9a80e0bb2_f194.jpg

 

fda107dd7f62fb183eb50660de337584_f195.jpg

 

City_of_Homestead_1308283.jpg

 

case_box.gif Traditional Delivery
case_box_check.gif Design-Build
case_box.gif Construction Management
case_box_check.gif Prime Contractor
case_box.gif New Construction
case_box_check.gif Retrofit/Renovation
case_box_check.gif Existing Facility

Project Profiles

  • Public/Government Water Treatment Plants
    • South County Regional WTP RO Expansion
    • Jupiter Nanofiltration Plant
    • City of Clearwater Water Treatment Plant #2
    • Tampa Bay Surface WTP
    • North Cape RO WTP
    • Peele Dixie Water Treatment Plant
    • Lake Region WTP
    • On-Site Sodium Hypochlorite Generation System
    • Membrane Softening Process Addition
    • SMHWTP Reservoir & Pump Station
    • Glades Road Water Disinfection
  • Public/Government Wastewater Treatment Plants
    • Septage Receiving & Solids Process Buildings
    • Chlorine Contact Tanks 5-9
    • SRWWTP Oxygen System Upgrade
    • SDWWTP Filter System
    • Effluent Pump Station No. 2
    • HLD Upgrade, Oxygenation Train #7
    • Existing Cogeneration Facility SDWWTP
    • Southwest Water Reclamation Facility Expansion
  • Public/Government Municipal - Other
    • RICE NESHAP Compliance, Phase I and II
  • Biotech/Healthcare
    • Bethesda Heart Institute
  • Education
    • Florida International University Chiller Plant
 

Poole & Kent Company of Florida

  • About Us
  • Services
  • Contact

EMCOR Group, Inc.

  • About Us
  • Locations
  • Investor Relations
  • Sustainability Efforts

NOTICE: Important Health Coverage Tax Documents.

©2025 EMCOR Group Inc.

Privacy Notice   |  CCPA Notice at Collection  |   Sitemap

NYSE: EME